OEM vessel integration
OEM Weigh Module Kits & Mounting Hardware
Put the complete mechanical and signal chain on one bill of materials, with a drawing revision and commissioning plan tied to the kit.
Request a kit review ↗Build a kit around the vessel BOM
- Matched load hardware
- Three or four mounts and load cells for most vessels, with six or eight supports available for a reviewed layout. Identify each location and fit, including any fixed or guided position.
- Signal summing
- Request a Type 4X stainless summing junction box or a project-specific IP-rated enclosure. Confirm trim method, cable entries, excitation and transmitter compatibility.
- Installation hardware
- Specify approved transit locks, solid dummy blocks and copper straps for the installation plan. Record which hardware is removed or released at commissioning.
- Factory records
- Request a calibration and corner-match sheet, cell serial traceability, a drawing revision, packaging labels and any private-label requirements in the quote.
Dummy blocks and welding-current control
WMD-DMY
Dummy alignment blocks
Specify rigid temporary blocks at the agreed assembly height to support an approved installation sequence before live load cells are fitted.
View engineering checklist ↗Put the temporary support arrangement and weld-current return path in the installation plan. Coordinate rigging and hot work with site procedures, then verify live cell seating and clearances before corner balancing.